Notes on open AI-infrastructure intelligence: measuring power, energy, and efficiency across the AI stack.
At KubeCon + CloudNativeCon Japan 2026, we ran Aitra Meter live for the full event, attributing real inference energy on an 8×H100 cluster down to namespace, workload, model, and tenant. One theme came up again and again on the floor: as AI becomes production infrastructure, teams need a way to measure, understand, and optimize it.
Read the recap →The Open Compute Project's 2026 APAC Summit put a run of open-standard work at the AI data center's power and interconnect layers into the spotlight, led by an 800 VDC power alignment among Google, Microsoft and NVIDIA.
Read more →